Steelway have recently improved their off-site fabrication operation, by investing in additional premises. The site is based in north Wolverhampton with excellent access to the motorway network, which helps with transporting the pre-assembled structures nationwide.
The off-site construction facility is served by 6no 5 tonne lifting capacity overhead cranes. We now have 3 Bays operational as demand for the service has increased.
If you are interested in seeing how we can help on your next project please get in touch by calling our team on 01902 451733 or using our contact form.
There is a growing demand for off-site modular construction across all sectors. Relating, both to the modular construction of entire buildings, and to off-site fabrication of large components. The reason for its popularity is the many benefits that come from fabricating and assembling elements before they leave the factory.
Documented benefits of off-site construction versus traditional on-site construction include:
Increased productivity and quality for large-scale commercial projects, the off-site assembly of components such as staircases, access platforms and walkways can save valuable time and money. Productivity is massively increased with offsite options because it means elements can be completed up to 50% faster than using traditional methods.
For more information please contact us today