Northern Industries Group logo
×

General enquiry

We'll reply to you within 1-2 working days.

Stay in the loop: tick the box below to join the Steelway mailing list for news and project updates. Leave it unticked to opt out. You can unsubscribe at any time.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Request an estimate

We'll reply to you within 1-2 working days.

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.

Stay in the loop: tick the box below to join the Steelway mailing list for news and project updates. Leave it unticked to opt out. You can unsubscribe at any time.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Technical enquiry

We'll reply to you within 1-2 working days.

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.

Stay in the loop: tick the box below to join the Steelway mailing list for news and project updates. Leave it unticked to opt out. You can unsubscribe at any time.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Modular Access Solutions for TSR Tank

Modular Access Solutions for TSR Tank

Location: Shropshire

Project Value: £45,000

‍

Project Overview

A key service provider in the water sector required a safe and efficient access solution for their TSR tank. To meet this need, Steelway designed, manufactured, and installed a high-quality industrial access platform, incorporating robust industrial stairs for secure entry and exit.

A standout feature of this project was the delivery of the access stairs in pre-built modules, a specialised service offered by Steelway. This approach significantly reduced on-site assembly time, minimised disruptions, and enhanced overall safety by lowering installation risks.

Steelway’s industrial platforms and stairs comply with all relevant building regulations, British standards, and load-bearing requirements. Whether bespoke or standard-sized, our solutions are tailored to meet the specific needs of our clients, ensuring both functionality and regulatory compliance.

Delivering Results

Steelway successfully delivered an access solution that met the client's operational and safety requirements. The pre-built modular design streamlined installation, reducing on-site construction time and allowing the client to integrate the access solution swiftly into their operations. By minimising on-site work, we also reduced risks associated with complex installations, ensuring enhanced safety for all personnel involved.

Furthermore, the platform and stairs were fully compliant with British standards, guaranteeing long-term reliability and adherence to industry regulations. The client also benefited from flexible customisation options, choosing between standard and bespoke configurations to ensure a perfect fit for their infrastructure.

Through a combination of expert design, precision manufacturing, and strategic installation, Steelway once again demonstrated its commitment to delivering high-quality, compliant, and innovative access solutions for the water sector.

"The modular approach meant minimal disruption on-site, and as always, the quality of the platform and stairs exceeded our expectations. Their expertise in safety and compliance was evident throughout."

— Project Engineer (Client)

From manufacturing the solutions to module build theninstallation, our team is involved every step of the way, ensuring every detailmeets the highest water industry standards. Discover how our solutions canenhance your projects—call us at 01902 451733 or email sales@steelway.co.uk today!

‍

‍

‍

No items found.
Steelway Logo
+44 (0) 1902 451 733
‍
sales@steelway.co.uk

Queensgate Works, Bilston Road,
Wolverhampton, West Midlands, WV2 2NJ
Northern Industries Group logo
Copyright Steelway Fensecure Ltd 2026. All Rights Reserved.
Steelway is part of the Northern Industries Group.

Modular Access Solutions for TSR Tank

Modular Access Solutions for TSR Tank

Location: Shropshire

Project Value: £45,000

‍

Project Overview

A key service provider in the water sector required a safe and efficient access solution for their TSR tank. To meet this need, Steelway designed, manufactured, and installed a high-quality industrial access platform, incorporating robust industrial stairs for secure entry and exit.

A standout feature of this project was the delivery of the access stairs in pre-built modules, a specialised service offered by Steelway. This approach significantly reduced on-site assembly time, minimised disruptions, and enhanced overall safety by lowering installation risks.

Steelway’s industrial platforms and stairs comply with all relevant building regulations, British standards, and load-bearing requirements. Whether bespoke or standard-sized, our solutions are tailored to meet the specific needs of our clients, ensuring both functionality and regulatory compliance.

Delivering Results

Steelway successfully delivered an access solution that met the client's operational and safety requirements. The pre-built modular design streamlined installation, reducing on-site construction time and allowing the client to integrate the access solution swiftly into their operations. By minimising on-site work, we also reduced risks associated with complex installations, ensuring enhanced safety for all personnel involved.

Furthermore, the platform and stairs were fully compliant with British standards, guaranteeing long-term reliability and adherence to industry regulations. The client also benefited from flexible customisation options, choosing between standard and bespoke configurations to ensure a perfect fit for their infrastructure.

Through a combination of expert design, precision manufacturing, and strategic installation, Steelway once again demonstrated its commitment to delivering high-quality, compliant, and innovative access solutions for the water sector.

"The modular approach meant minimal disruption on-site, and as always, the quality of the platform and stairs exceeded our expectations. Their expertise in safety and compliance was evident throughout."

— Project Engineer (Client)

From manufacturing the solutions to module build theninstallation, our team is involved every step of the way, ensuring every detailmeets the highest water industry standards. Discover how our solutions canenhance your projects—call us at 01902 451733 or email sales@steelway.co.uk today!

‍

‍

‍

No items found.
Steelway Fensecure Logo
+44 (0) 1902 490 919
‍
sales@fensecure.co.uk

Queensgate Works,Bilston Road,
Wolverhampton,West Midlands,WV2 2NJ
Northern Industries Group logo
Copyright Steelway Fensecure Ltd 2023. All Rights Reserved. Steelway is part of the Northern Industries Family
Website by Gravitas

Modular Access Solutions for TSR Tank

Modular Access Solutions for TSR Tank

Location: Shropshire

Project Value: £45,000

‍

Project Overview

A key service provider in the water sector required a safe and efficient access solution for their TSR tank. To meet this need, Steelway designed, manufactured, and installed a high-quality industrial access platform, incorporating robust industrial stairs for secure entry and exit.

A standout feature of this project was the delivery of the access stairs in pre-built modules, a specialised service offered by Steelway. This approach significantly reduced on-site assembly time, minimised disruptions, and enhanced overall safety by lowering installation risks.

Steelway’s industrial platforms and stairs comply with all relevant building regulations, British standards, and load-bearing requirements. Whether bespoke or standard-sized, our solutions are tailored to meet the specific needs of our clients, ensuring both functionality and regulatory compliance.

Delivering Results

Steelway successfully delivered an access solution that met the client's operational and safety requirements. The pre-built modular design streamlined installation, reducing on-site construction time and allowing the client to integrate the access solution swiftly into their operations. By minimising on-site work, we also reduced risks associated with complex installations, ensuring enhanced safety for all personnel involved.

Furthermore, the platform and stairs were fully compliant with British standards, guaranteeing long-term reliability and adherence to industry regulations. The client also benefited from flexible customisation options, choosing between standard and bespoke configurations to ensure a perfect fit for their infrastructure.

Through a combination of expert design, precision manufacturing, and strategic installation, Steelway once again demonstrated its commitment to delivering high-quality, compliant, and innovative access solutions for the water sector.

"The modular approach meant minimal disruption on-site, and as always, the quality of the platform and stairs exceeded our expectations. Their expertise in safety and compliance was evident throughout."

— Project Engineer (Client)

From manufacturing the solutions to module build theninstallation, our team is involved every step of the way, ensuring every detailmeets the highest water industry standards. Discover how our solutions canenhance your projects—call us at 01902 451733 or email sales@steelway.co.uk today!

‍

‍

‍

No items found.
Copyright Steelway Fensecure Ltd 2023. All Rights Reserved. Steelway is part of the Northern Industries Family
Website by Gravitas

Modular Access Solutions for TSR Tank

Modular Access Solutions for TSR Tank

Location: Shropshire

Project Value: £45,000

‍

Project Overview

A key service provider in the water sector required a safe and efficient access solution for their TSR tank. To meet this need, Steelway designed, manufactured, and installed a high-quality industrial access platform, incorporating robust industrial stairs for secure entry and exit.

A standout feature of this project was the delivery of the access stairs in pre-built modules, a specialised service offered by Steelway. This approach significantly reduced on-site assembly time, minimised disruptions, and enhanced overall safety by lowering installation risks.

Steelway’s industrial platforms and stairs comply with all relevant building regulations, British standards, and load-bearing requirements. Whether bespoke or standard-sized, our solutions are tailored to meet the specific needs of our clients, ensuring both functionality and regulatory compliance.

Delivering Results

Steelway successfully delivered an access solution that met the client's operational and safety requirements. The pre-built modular design streamlined installation, reducing on-site construction time and allowing the client to integrate the access solution swiftly into their operations. By minimising on-site work, we also reduced risks associated with complex installations, ensuring enhanced safety for all personnel involved.

Furthermore, the platform and stairs were fully compliant with British standards, guaranteeing long-term reliability and adherence to industry regulations. The client also benefited from flexible customisation options, choosing between standard and bespoke configurations to ensure a perfect fit for their infrastructure.

Through a combination of expert design, precision manufacturing, and strategic installation, Steelway once again demonstrated its commitment to delivering high-quality, compliant, and innovative access solutions for the water sector.

"The modular approach meant minimal disruption on-site, and as always, the quality of the platform and stairs exceeded our expectations. Their expertise in safety and compliance was evident throughout."

— Project Engineer (Client)

From manufacturing the solutions to module build theninstallation, our team is involved every step of the way, ensuring every detailmeets the highest water industry standards. Discover how our solutions canenhance your projects—call us at 01902 451733 or email sales@steelway.co.uk today!

‍

‍

‍

No items found.
Steelway Protect Logo
+44 (0) 1902 921 525
‍
protect@steelway.co.uk

Brickhouse Lane, West Bromwich,
West Midlands, B70 0DY
Northern Industries Group logoLPCB Accreditation
Copyright Steelway Fensecure Ltd 2023. All Rights Reserved. Steelway is part of the Northern Industries Family
Website by Gravitas

Modular Access Solutions for TSR Tank

Modular Access Solutions for TSR Tank

Location: Shropshire

Project Value: £45,000

‍

Project Overview

A key service provider in the water sector required a safe and efficient access solution for their TSR tank. To meet this need, Steelway designed, manufactured, and installed a high-quality industrial access platform, incorporating robust industrial stairs for secure entry and exit.

A standout feature of this project was the delivery of the access stairs in pre-built modules, a specialised service offered by Steelway. This approach significantly reduced on-site assembly time, minimised disruptions, and enhanced overall safety by lowering installation risks.

Steelway’s industrial platforms and stairs comply with all relevant building regulations, British standards, and load-bearing requirements. Whether bespoke or standard-sized, our solutions are tailored to meet the specific needs of our clients, ensuring both functionality and regulatory compliance.

Delivering Results

Steelway successfully delivered an access solution that met the client's operational and safety requirements. The pre-built modular design streamlined installation, reducing on-site construction time and allowing the client to integrate the access solution swiftly into their operations. By minimising on-site work, we also reduced risks associated with complex installations, ensuring enhanced safety for all personnel involved.

Furthermore, the platform and stairs were fully compliant with British standards, guaranteeing long-term reliability and adherence to industry regulations. The client also benefited from flexible customisation options, choosing between standard and bespoke configurations to ensure a perfect fit for their infrastructure.

Through a combination of expert design, precision manufacturing, and strategic installation, Steelway once again demonstrated its commitment to delivering high-quality, compliant, and innovative access solutions for the water sector.

"The modular approach meant minimal disruption on-site, and as always, the quality of the platform and stairs exceeded our expectations. Their expertise in safety and compliance was evident throughout."

— Project Engineer (Client)

From manufacturing the solutions to module build theninstallation, our team is involved every step of the way, ensuring every detailmeets the highest water industry standards. Discover how our solutions canenhance your projects—call us at 01902 451733 or email sales@steelway.co.uk today!

‍

‍

‍

No items found.
CEL Logo

CEL Sheet Metal Ltd is a UK based sheet metal and assembly business, offering a variety of services that can effectively replace your existing sub-contract manufacturing requirements.

+44 (0) 1952 200 741
sales@celsheetmetal.com
Stafford Park 11
Telford
Shropshire
TF3 3AY
Copyright CEL Sheetmetal ltd 2023. All Rights Reserved.   Privacy Policy   |    Terms of Service    |    Website by Gravitas
ISO certification markNorthern Industries Group logo