Steelway are pleased to announce they have improved their Off-Site / modular build operation, by investing in additional premises. The site is based north of Wolverhampton with excellent access to the motorway network which helps with transporting the pre-built structures nationwide.
The 3-bay facility is served by 6no 5 tonne lifting capacity overhead cranes. Bay 1 is now operational, bays 2 and 3 will be operational early in 2020 as demand for the service increases.
Benefits